THE LIVING AEGEAN · PUBLIC ROADMAP

PUBLIC PROJECT DOSSIER · 07

Urla Green Loop

A low-car network linking arrival, centre, İskele, food and wine clusters, Gülbahçe and İYTE.

REALITY TODAY

What exists—and what does not.

This is a mobility vision, not an approved public-works project or transport service. Routes, land rights, budgets and authority participation are unconfirmed.

THE 2030 OUTCOME

The promise must become useful.

A coherent chain of safe walking, cycling, shuttle and arrival choices that reduces congestion while widening access to the peninsula.

DELIVERY GATES

A sequence, not a percentage.

A project advances only when the evidence required by a gate becomes public. Visual polish never counts as delivery.

  1. 01

    PUBLIC BRIEF

    Purpose, boundaries and non-negotiables are public.

    CURRENT GATE
  2. 02

    COALITION

    A responsible lead and qualified participants are named.

    NOT YET REACHED
  3. 03

    FEASIBILITY

    Demand, land, water, access, economics and impacts are tested.

    NOT YET REACHED
  4. 04

    AUTHORIZATION + CAPITAL

    Legal permissions, governance and committed funding exist.

    NOT YET REACHED
  5. 05

    PILOT

    A limited real-world version operates and is evaluated.

    NOT YET REACHED
  6. 06

    OPERATING + MEASURED

    People can use it and public outcomes are reported.

    NOT YET REACHED

MEASURES OF TRUTH

What success must prove.

  1. 01

    Mode shift from private cars

  2. 02

    Safe kilometres connected

  3. 03

    Resident and worker travel time

NON-NEGOTIABLES

What growth must protect.

  1. 01

    Universal access

  2. 02

    No greenfield route without ecological review

  3. 03

    Resident mobility before visitor spectacle

PARTICIPATION NEED

Useful capability before publicity.

Mobility planners, accessibility advocates, operators, institutions and relevant public authorities.

LIVING TERROIR BASELINE

Distribute journeys without flattening villages.

The village and season map can shape low-car routes only after access, capacity and resident boundaries are verified.

Inspect the zero-based baseline ↗